CURRENT RATES AND FEES AS OF OCTOBER 1, 2010
Water Rates and Fees
Wastewater Rates and Fees
Miscellaneous Fees
Additional Information
WATER RATES, FEES AND CHARGES
|
Monthly Basic Water Service Charge (aka water base rate): |
|
3/4" meter or smaller: |
$38.55 per dwelling unit |
|
1" meter: |
$68.86 per dwelling unit |
|
1 ½" meter |
$159.71 per dwelling unit |
|
2" meter: |
$311.13 per dwelling unit |
|
3" meter: |
$523.10 per dwelling unit |
|
Larger than a 3" meter: |
Base charge for 3/4" meter multiplied by the ratio of the
area of the nominal meter size opening to the area of the
opening of a 3/4" meter (.4418 sq.in.) |
|
2 meters per dwelling |
$57.84 per dwelling unit |
|
Monthly Water Usage Charge (aka tiered water use): |
|
1 to 600 cubic feet |
$1.95 per hundred cubic feet |
|
601 to 1000 cubic feet |
$4.68 per hundred cubic feet |
|
1001 to 1600 cubic feet |
$7.88 per hundred cubic feet |
|
1601 to 2000 cubic feet |
$10.80 per hundred cubic feet |
|
2001 to 3000 cubic fee |
$16.97 per hundred cubic feet |
|
3001 to 4000 cubic feet |
$21.20 per hundred cubic feet |
|
4001 cubic feet and above |
$27.54 per hundred cubic feet |
|
Monthly Lifeline Rate |
|
Basic Service Charge |
$26.99 |
|
Basic Wastewater Charge |
$27.76 |
New Water Connection: $17,500.00
Water Feasibility Study Application: $100.00
Metered Connection to a Hydrant: $65.00 rental fee plus $11.00 per 100 cubic feet ($1000.00 deposit required)
Backflow Device Test: $70.00 per test
Verification of Separation: $45.00
Water Service Shut Off or On as requested by customer or required by District : $65.00 (waived
if customer installs shut off valve enclosed in a box on consumer's side of water meter)
Relocation or replacement of Water Meter at Customer's Request: District cost, including labor and materials,
plus 20%, but in no case less than $250.00.
Backflow Device Installation: District cost, including labor and materials, plus 20%, but in no
case less than $250.00
Meter Bench Testing at Customer's Request: $100.00 if meter found to be operable (No charge if meter found to be inoperable)
-
Irrigation Wells:
- Permit Application: $150.00
Abandonment Application: $100.00
Well Inspection/Testing: $100.00
WASTEWATER RATES, FEES AND CHARGES
Monthly Basic Wastewater Charge: $39.65
Monthly Holding Tank Inspection: $60.00 per billing period, $60.00 per inspection
Quarterly Holding Tank Inspection: $20.00 per billing period, $60.00 per inspection
Pre-Application Consultation: $750.00
- Site Review and/or Field Consultation
- Vacant Lot: $1,350.00
Existing Structure: $500.00
- Wastewater System Design Review:
- Standard System: $1,900.00
Sand Filter System: $3,000.00
Alternative System: $4,500.00
Resubmitted Wastewater System Design for Review: $750.00
Septic Tank Replacement Application: $550.00
System Design Review Exemption: $450.00
Variance Request Application: $2,000.00
Waiver Request Application: $1,500.00
Final Plan Sign Off at Marin County Community Development Agency: $250.00
Design Permit Extension Application: $350.00
Design Permit Exemption Application: $450.00
Maintenance Permit: $20.00
Construction Permit: $150.00
Reschedule Inspection Fee: $50.00/incident
Alternative Quarterly Inspection Fee: $60.00
|
Temporary Restroom (Chemical Toilet) Permit |
$50.00/toilet for 1 to 7 day permit
$100.00/toilet for 8 days to 3 months
$125.00/toilet for 3-6 months
$200.00/toilet over 6 months
|
MISCELLANEOUS
Change of Ownership Administrative Fee: $45.00
Change of Address Fee (if more than one in a calendar year): $10.00
Returned (Bounced) Check Processing Fee: $25.00
Late Payment Charge: 10% of bill
48 Hour Late Payment Turnoff Notice: $25.00
Pumping Contractor Annual Permit: $300.00
Photocopy of Any District Document: $.25 per page
District Wastewater Policy (Title IV) Copy: $35.00
Standard Drawing Copy: $25.00
|